Estimated speed
Projections view factory-based assembly as a way to potentially lower cycle times, depending on specific site requirements.
Standard modulars
System utilizes repeatable architectural models intended to facilitate production and throughput.
Supply chain workflows
Planned central procurement strategies intended to help manage material costs and lead times.
Planned scalable capacity
Designing a manufacturing network intended to scale with developer pipeline requirements.
Controlled build
Proposed off-site environment intended to support high-precision assembly and quality control targets.
Planned delivery goals
Objective is to coordinate logistics and site assembly as a possible means to support housing delivery timelines.
Project Suitability
Seeking multifamily, affordable, senior, student housing, and hospitality hubs.
Proposed scope includes 3–5 story wood-frame volumetric builds in the region.
Proposed steps
01
Concept Review
We review project goals to assess how they might align with our intended production model.
02
Technical Audit
Assessment of site conditions and loading needs to determine if manufacturing is a viable option.
03
Workflow Design
Review of structural plans to evaluate how they may be adapted for timber-frame plant production.
04
Production
Intended automated manufacturing with planned logistics paths toward site installation goals.
.jpg)